CLIMATOLOGY & CLIMATE RISK

Climate Risk Assessment and Long-Term Climate Analysis

Climate baselines, extreme event and trend analysis, and downscaled projection scenarios for planning, approvals, infrastructure design and operational risk across Australia.

Climatology

Long-term climate analysis that reduces risk in planning, approvals and day-to-day operations.

Climatology describes the conditions and extremes your project will live with for decades, not the weather next week. Air Environment's air quality assessment consultants build climate baselines and risk assessments that support planning, design, approvals and operational decisions for sites across Australia.

  • Heat and humidity exposure that affects workforce health, safety and productivity
  • Rainfall, flood and drought risk that disrupts operations and scheduling
  • Seasonal wind patterns that shape emissions, dust and dispersion outcomes
  • Extreme event likelihood that threatens assets, compliance and uptime

Trusted by industry, government, developers and legal teams across Australia

GHD logo TasWater logo Fotowatio Renewable Ventures logo WR Lawyers logo

Our climatology capabilities

Long-term climate analysis

We analyse historical records to identify trends in temperature, rainfall, wind and extreme events for your site and region.

Climate risk assessment

We assess how climate variability and long-term change may affect operations, infrastructure and compliance risk.

Extreme weather assessment

We evaluate heatwaves, droughts, intense rainfall and other extremes to quantify operational vulnerability and return periods.

Climate data interpretation

We translate complex climate datasets into clear insights that support planning, approvals and risk management.

Historical and baseline studies

We establish climate baselines for proposed developments to support environmental impact assessment and approvals.

Climate projection analysis

We assess future scenarios using recognised downscaled projection datasets to inform long-term design and investment decisions.

Operational exposure analysis

We review how climate conditions influence emissions, dust generation and air quality outcomes across the year.

Reporting and regulatory support

We deliver structured, defensible reporting suited to development applications, regulatory submissions and peer review.

Datasets

The climate datasets we work with

Climate data is easy to download and easy to misread. Which dataset you start from changes the answer, so we name it every time.

DatasetTypeWhat it gives you
BoM station observationsObservationsDaily and monthly records from the Bureau's observing network. The starting point for any site baseline, once representativeness and completeness are checked.
ACORN-SATHomogenised observationsThe Bureau's homogenised daily temperature record for 112 locations from 1910. Used for trend work, where site moves and instrument changes would otherwise manufacture a trend that is not real.
AGCDGridded analysisAustralian Gridded Climate Data, the Bureau's official gridded rainfall and temperature analysis on a 5km grid. It replaced AWAP in 2020. Gives spatial context where no station sits near the site.
SILOPatched point dataQueensland Government patched point and gridded datasets from 1889. Continuous daily series with gaps already infilled, widely used for agriculture, water and operational modelling.
ERA5ReanalysisECMWF's global reanalysis, hourly from 1940. Supplies upper air, wind and humidity fields where surface records alone are not enough.
CMIP6Global projectionsThe global climate model ensemble underpinning the IPCC Sixth Assessment Report. Sets the scenario framing before any downscaling.
NARCliM2.0Downscaled projectionsReleased in 2024 at 4km over south-eastern Australia and 20km across Australasia, downscaling five CMIP6 models under SSP1-2.6, SSP2-4.5 and SSP3-7.0.
QldFCP-2Downscaled projectionsQueensland Future Climate Projections, around 60 downscaled CMIP6 simulations at 10km. The better fit for Queensland sites.

Swipe the table sideways to see all columns.

Which dataset matters more than most people expect. A raw station record and a homogenised one can point in different directions over the same period, because a station move or an instrument change leaves a step in the data that looks exactly like a climate signal. We name the dataset, the period and the version in every report, so a reviewer can reproduce the number rather than take it on trust.

0501001502000102030Rainfall (mm)Temp (°C)JanFebMarAprMayJunJulAugSepOctNovDecMonthly rainfallMean daily maximumMean daily minimumAnnual total 1,075 mmAnnual total 1,075 mm43% of the annual total falls Jan to Mar43% of the annual total falls Jan to Mar
Figure: illustrative climogram for a subtropical east-coast site, showing monthly rainfall against mean daily maximum and minimum temperature. Not client data. A climogram is the fastest way to see when a site is wet, when it is hot, and when those two overlap, which is usually what drives scheduling and dust risk.

Why choose Air Environment's air quality assessment consultants

Anyone can pull a 30-year average off a website. The value is in knowing whether that average means anything for your site, and saying so when it does not.

Fit-for-purpose baselines

We match record length, station selection and statistics to the decision, not to whichever dataset is closest to hand.

Rigorous data handling

Gap filling, homogeneity checks and station comparisons happen before any conclusion is drawn.

Transparent methods

Datasets, versions, periods and limitations are documented so a reviewer can reproduce the number.

Delivery on real timelines

Streamlined processing and scalable workflows meet approval and reporting deadlines without cutting corners.

Uncertainty stated plainly

We separate what the historical record shows from what a projection implies, and say how confident each is.

Interpretation for decision-makers

We explain what the trend means for design, scheduling and risk, not just the statistics behind it.

Scoping

Historical record, climate projections, or both?

This is the question that sets your budget and your timeline. It is much cheaper to answer before a scope is written than after.

The historical record

Analysis of what has actually been observed at or near the site, going back as far as the record allows.

Strongest when

Establishing a baseline for an approval, quantifying exposure that already exists, or answering a claim about current conditions.

Timeline

Weeks. The data already exists, so effort goes into station selection, quality control and interpretation.

Watch for

Station moves, instrument changes and gaps. An unhomogenised record can show a step change that looks like climate but is really a shift in how it was measured.

Climate projections

Downscaled model scenarios describing plausible future conditions under different emissions pathways.

Strongest when

Assets or approvals run for decades, or a regulator, lender or board has asked for forward-looking physical risk.

Timeline

Longer. Scenario selection, ensemble handling and interpretation drive the effort, not the data pull.

Watch for

Single-number answers. A projection is a range across scenarios and models. Presenting one figure as the future is where assessments get taken apart in review.

Most climate risk work needs both. The record sets the baseline and proves the method, projections extend it. We will also tell you when a projection adds nothing to the decision you are actually making.

0102030Days per year ≥ 35°C881212131317172121197519851995200520152024Individual yearsDecadal averageDecadal average up from 8 to 21 days
Figure: illustrative count of days at or above 35°C, by year and by decadal average. Not client data. Individual years swing widely, which is why a single hot summer proves nothing on its own and a decadal average does. This is also the pattern that catches out design thresholds set from a 1990s record.

What you receive

Every climatology engagement lands as a defined set of deliverables, not a folder of downloaded CSVs.

Climate baseline statistics

Monthly and annual normals for temperature, rainfall, humidity and wind, with the reference period and station selection stated up front.

Extreme event analysis

Frequency and return periods for heat, intense rainfall and drought, so design thresholds are set against evidence rather than memory.

Trend analysis with significance testing

Direction, magnitude and whether the trend is statistically significant, not a line drawn by eye through a noisy record.

Projection scenarios where relevant

Scenario ranges rather than single numbers, with the emissions pathways and downscaled datasets named.

Report-ready figures

Climograms, wind roses, trend plots and exceedance tables built to drop straight into a submission.

A written technical report

Plain-English interpretation of what the climate means for design, scheduling and risk, structured for approvals and peer review.

Where climate analysis changes the decision

Development approvals and EIS

Climate baselines and statistics supporting planning applications, environmental impact statements and works approvals.

Infrastructure design and asset life

Design conditions, extremes and return periods for assets expected to operate for decades.

Heat, humidity and workforce safety

Exposure analysis supporting heat management plans, shift design and safe work procedures.

Rainfall, flood and drought exposure

Wet and dry season statistics that inform scheduling, water management and contingency planning.

Dust and emissions risk windows

Analysis identifying the seasons and conditions when impacts are most likely, with input from our air pollution consultant team.

Climate risk and disclosure reporting

Site-level physical climate risk inputs for board reporting, due diligence and climate-related financial disclosure.

Agriculture, land use and water

Growing season, evaporation and rainfall reliability statistics for operations that live and die by the weather.

Litigation and expert evidence

Independent climate analysis and expert testimony for court, tribunal and mediation.

Process

How we deliver defensible outcomes

01. Define the decision and risk

We clarify what must be proven and what the project needs to achieve.

02. Design the right approach

Monitoring, sampling and modelling designed to be credible and efficient.

03. Analyse and stress-test

We interpret results, test assumptions and quantify uncertainty where needed.

04. Report clearly and support outcomes

Regulator-ready reporting, stakeholder clarity, and support through next steps.

Testimonial

Hear From Our Clients

quote

Andrew and the team proved to be very flexible and responsive in accommodating changes and providing strategic and technical advice. I would highly recommend Air Environment and will certainly use them again.

Dr Stuart Winchester
Principal GeoEnvironmental Scientist for Energy and Resources
quote

I would recommend Air Environment for any matter involving the detailed analysis and interpretation of meteorological data and the development of atmospheric meteorological models.

Edie Mather
Development – Australia
quote

Andrew’s reporting and evidence provided to the court was thorough, clear, compelling and to the point and resulted in the client achieving a successful outcome.

William Gallagher
Principal Lawyer

Air Environment capability statement

A short overview of our services, the models we run, our laboratory capability and the project experience behind them. Useful if you are building a shortlist or need something to circulate internally.

PDF, no form to fill in
Download the capability statement
Faq

Answers to common questions

Common questions about climate baselines, datasets, projections, extreme event analysis, and how climatology supports approvals and risk management.

What is the difference between meteorology and climatology in an assessment?

Meteorology deals with the hour-to-hour conditions that drive a specific dispersion result. Climatology describes the typical conditions and the extremes across decades. Approvals usually need both: meteorology for the modelling, climatology for the baseline and the risk narrative around it.

How long a climate record do you use for a baseline?

Long enough for the statistic to mean something. Thirty years is the conventional reference period for describing normals, and it is what most guidelines expect. Useful work can be done on shorter records where a station is newer, provided the limitation is stated rather than buried. We select stations on data completeness and representativeness, not on distance alone.

Which climate datasets do you use?

Bureau of Meteorology station observations and ACORN-SAT for homogenised temperature, AGCD for gridded rainfall and temperature, SILO for patched daily series, and ERA5 reanalysis where upper air or wind fields are needed. For projections we work with CMIP6 and the downscaled products that suit the location, including NARCliM2.0 for south-eastern Australia and QldFCP-2 for Queensland. Every report names the dataset, version and period used.

Do you use climate projections, and how do you handle uncertainty?

Yes, where the decision has a long enough horizon to justify it. We present results as scenario ranges across multiple models rather than a single number, name the emissions pathways used, and keep a clear line between what the historical record shows and what a projection implies. A projection reported as one figure is a projection that will not survive review.

Can climate analysis support a development application or EIS?

Yes, and it is cheaper to do once, early. Bringing in an air impact assessment consultant at the baseline stage means the climate and meteorological scopes can be set together, rather than repeated when a reviewer asks for more.

How does climate affect air quality and odour risk?

Strongly, and often more than operators expect. Temperature inversions, calm periods, seasonal wind patterns and dry spells all shift when impacts are most likely to occur and be noticed. Our air pollution consultant and odour consultant teams use climate analysis to identify the conditions that create the highest-risk windows at a site, which is what makes a management plan practical rather than generic.

Can you support climate-related financial disclosure?

We provide the physical climate risk inputs: exposure to heat, rainfall, drought, wind and extreme events at specific sites, with datasets and scenarios documented. We are not accountants and we do not prepare the disclosure itself, but we supply the site-level evidence that sits underneath it.

What makes your work “defensible”?

Defensible work is transparent and review-ready. We document data sources, periods, gap-filling and quality checks, use fit-for-purpose methods, and present conclusions clearly so regulators and stakeholders can follow how we got there.

Do you work Australia-wide?

Yes. We deliver air consulting services across Australia, including regional and remote sites, and have supported international projects for clients across Asia-Pacific, the Middle East, and North and South America.

Can you provide independent review or expert witness support?

Yes, where appropriate. We provide independent technical review and clear written opinions for high-scrutiny contexts. All of our senior consultants have experience giving expert testimony in court, tribunal and mediation settings.

Talk to our air quality consultants about climate risk on your project